Caple FSCHW5 User Manual Page 3

  • Download
  • Add to my manuals
  • Print
  • Page
    / 5
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 2
2
MOUNTING OF THE HOOD IN THE LOWER PART OF A HANGING CUPBOARD
Drill 4 holes of 6mm diameter at the bottom of the hanging cupboard as shown in the drawing
fig.1.
Fit the hood in the cabinet with 4 screws, which are appropriate to that kind of cupboard.
The appliance is provided with 2 air outlets, one which is in the upper part and the other on
the back. Both of them can be used according to your requirements. A connecting ring ©, to
join the connecting pipe to, and a cover (A) to close the air outlet, which is not used, are
supplied.
MOUNTING OF THE HOOD ON THE WALL
Drill 4 holes on the wall, which correspond to the position (B-Z) of the drawing fig.1.
Hang the hood on the 2 holes using the screws and dowels with expanding plug, which are
appropriate for that kind of wall (ex. concrete, plasterboard etc.)
Fix the hood through the 2 security holes (Z).
CHANGING FROM EXHAUSTING METHOD TO FILTERING METHOD
In order to make this change, carbon filters CAP19CF are included. Active carbon filters are
necessary to purify the air, released into the room. Filters are not washable; they cannot be
regenerated and have to be replaced at most every 4 months. The saturation of the activated
charcoal depends on the prolonged use of the hood, on the type of cooking and on the
regularity of cleaning the grease filter. The filter (D) has to be applied to the aspirating group,
which is inside the hood hitting the centre of the group with it and turning it of 90 degrees until
the stop click is heard to lock it. Remove the grill (G) to carry out this operation. Close with the
appropriate covers the upper and back air outlets; turn the small lever (L) from the position (A)
to the position (F).In this way the hood is ready for the filtering function.
Page view 2
1 2 3 4 5

Comments to this Manuals

No comments